Jump to main content
Property Report

OPES Campus M70, Munich Ascendis Pharma

Innovative construction project in northern Munich

Sustainability and modern architecture combined

A forward-looking neighborhood featuring 600 apartments, a senior living facility, and approximately 47,000 square meters of office space is being developed on the Knorr-Bremse campus in northern Munich.

For this project, OPES Immobilien is committed to the highest environmental standards and places great emphasis on energy and resource consumption. This is reflected in every aspect, from the design of the buildings and the use of materials to the construction process, as well as the equipment and operation throughout the entire lifecycle.

Sustainable Energy Concepts

The buildings are heated and cooled with virtually zero CO2 emissions, thanks to innovative groundwater heat pumps. The electricity required for this is largely generated by photovoltaic systems installed on the rooftops. This sustainable energy concept underscores OPES Immobilien’s commitment to environmentally friendly and forward-thinking construction.

Impressive interior design

A particular highlight of the project is the impressive interior design. The spaces occupied by tenant Ascendis Pharma feature an innovative glass partition system. Four-meter-high all-glass walls with single-pane glazing in the T50 system create an open and bright atmosphere. These glass walls add aesthetic appeal while offering transparency and a sense of spaciousness.

High-quality and functional details

The wall surfaces are finished with a matte anti-fingerprint coating, ensuring an easy-to-maintain and durable surface. Solid partition walls in the T10 system provide privacy and functionality. This is complemented by flush-mounted doors that blend seamlessly into the modern and elegant design, creating a harmonious overall look.

Projects at: baunetz interior/design
Transparency and Openness
Interior Design by Lang Hugger Rampp Architects

Products

Client
OPES Immobilien Gruppe
Implementation
Geiger Schlüsselfertigbau GmbH
Interior finishing
Lang Hugger Rampp GmbH | Architekten
Total leasable area
16.834 m2
Location
München, Bürocampus MO‘ANDER
Completion
2024
Photos
Michael Frank